A construction dumpster is a roll-off sized to the phase of the build, not the whole job. Heavy phases like demo, concrete and roofing need smaller boxes and quicker swaps. Light phases like framing and drywall can use a 30 or 40 yard. EPA’s job-site surveys put new home construction at about 4.39 pounds of debris per square foot.
The Short Version
- Plan boxes by build phase. The debris changes as the job moves.
- Weight runs out before space on heavy loads. Concrete weighs about five times as much per yard as framing lumber.
- Keep concrete and metal separate when you can. EPA highlights both as commonly recycled from job sites.
- OSHA requires debris to be cleared from work areas and removed as the work progresses.
- On sites under the TCEQ construction stormwater permit, waste containers get covered at day’s end and during storms.
- Texas construction debris goes to permitted landfills, and regulated asbestos cannot go to the construction-debris ones.
- Call for a swap before the box is full, not after it overflows.
Baytown and the rest of Chambers and Liberty County keep building, from refinery and industrial contractors to new homes, remodels and roof tear-offs after coastal storms. Every one of those jobs makes debris, and the builders who plan for it spend less time waiting on a haul. This guide is for contractors, remodelers and owner-builders who want the dumpster to keep up with the schedule instead of holding it up.
Send us your build schedule. We will plan the boxes.
Tell us the job, the phases and the dates, and we will line up the right roll-off for each stage.
Call (936) 548-9300.
Request a Job-Site QuoteHow Much Debris Does a Construction Job Actually Make?
More than most people guess, and far more on remodels than on new builds. The best published numbers come from job-site surveys the U.S. Environmental Protection Agency compiled in its 2009 report, Estimating 2003 Building-Related Construction and Demolition Materials Amounts.
For new residential construction, EPA’s average is 4.39 pounds of debris per square foot, based on 293 surveyed homes. Nonresidential new construction comes in close, at 4.34 pounds per square foot. By our math, a 2,000 square foot house works out to about 8,780 pounds, or roughly 4.4 tons of debris over the whole build.
Remodels run much higher per square foot. The same report explains that remodeling “typically generates more waste per square foot than new construction, largely because of the demolition that accompanies remodeling.” The individual surveys it cites include:
- A bathroom remodel: 72.10 pounds per square foot
- A kitchen remodel: 64 pounds per square foot
- A whole-house remodel: 19.55 pounds per square foot
- A roof replacement covering 1,400 square feet: 4,640 pounds total
Demolition is heavier still. EPA estimates a 1,600 square foot single-family house on a slab, with its garage floor and driveway, at 78.8 tons torn out, about 98.4 pounds per square foot. Nearly half of that weight is the concrete alone.
Keep these numbers in perspective. They are national figures from job surveys taken in the 1990s and compiled by EPA in 2009. They are useful for planning, not as a quote for your job. For the weight of each material per cubic yard, see our guide on what debris weighs per cubic yard.
How Should You Plan the Boxes by Phase of the Build?
Match the box to the phase, because each stage of the job throws off a different kind of debris. EPA’s standard volume-to-weight factors show how different those loads are.
Demo and site prep. Concrete, dirt, rock and old asphalt are the heaviest debris on any job. Use a smaller box, keep it to that material and plan on more frequent hauls. Our 20-yard roll-off, the smallest box we run, is the one to start with for heavy debris like concrete, dirt, brick and roofing tear-offs.
Framing. Lumber offcuts and packaging are light and bulky, so a big box earns its keep here. The 30-yard is the usual pick for new construction and framing.
Roofing. Shingles are heavy for their bulk, so a tear-off fills a box’s weight long before it fills the space.
Drywall and interior. Gypsum board, trim and mixed interior debris sit in the middle of the range.
Finish and punch list. Cardboard, packaging and small scraps. EPA notes that cardboard from home-building sites often ends up mixed in with the rest of the construction debris.
Tell us the phases and the dates, and we will plan the sequence of construction roll-off dumpsters for you. For a size-by-project breakdown, see our size-by-project guide.
Why Shouldn’t You Mix Heavy and Bulky Debris?
Because a box with a foot of concrete in the bottom and a box full of framing scrap are two very different loads. Mixing them wastes either the space or the weight allowance.
By EPA’s factors, a cubic yard of concrete weighs 860 pounds and a cubic yard of clean lumber weighs 169. That makes the concrete about five times heavier for the same space. Throw a few yards of broken slab into a box of lumber and the load can hit its weight limit while the box still looks half empty.
Our own size guidance says the same thing. The 40-yard is for bulky, light material like furniture, drywall and packaging, not concrete or dirt, because the weight limit hits fast. For concrete and dirt, a 10 or 20 yard keeps the load under weight.
Should You Separate Concrete and Metal?
Yes, when you can. EPA highlights concrete and metal as materials commonly recycled from job sites, and keeping them clean is what makes that possible.
The EPA’s page on sustainable management of construction and demolition materials says that “asphalt, concrete, and rubble are often recycled into aggregate or new asphalt and concrete products,” and that metals like steel, copper and brass “are also valuable commodities to recycle.” The scale is big: EPA reports that 600 million tons of construction and demolition debris were generated in the United States in 2018, and that just over 455 million tons of it went to a next use, mostly as aggregate.
OSHA’s construction housekeeping rule points the same way. It says containers “shall be provided for the collection and separation of waste.” If your job will produce a lot of clean concrete or scrap metal, ask us about a separate box for it before demo day.
When Should You Schedule a Swap?
Before the box is full, not after debris is spilling over the sides. An overflowing box is a safety problem on the site and, on larger jobs, a stormwater problem too.
OSHA’s rule for disposing of waste on construction sites, 29 CFR 1926.252, says “all scrap lumber, waste material, and rubbish shall be removed from the immediate work area as the work progresses.” On sites covered by the Texas construction stormwater permit, the rule is stricter: waste “must be cleaned up immediately if containers overflow.”
So watch the fill line, and call before the day you need the box emptied. With Tru-Tex, you load on your schedule and call for a swap anytime.
For long builds with steady trash, a commercial dumpster service for long builds can sit alongside the roll-off. Here is how front-load vs. roll-off compares.
Box filling faster than planned?
Call (936) 548-9300 and we will get a swap on the schedule.
Request a Swap or QuoteWhat Do OSHA and TCEQ Expect on a Job Site?
OSHA requires debris to be kept clear and removed at regular intervals. Where the Texas construction stormwater permit applies, waste containers must also be covered at the end of the day and during storms.
OSHA’s general housekeeping rule, 29 CFR 1926.25, says debris “shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures,” and that combustible scrap “shall be removed at regular intervals during the course of construction.” Two more rules in 1926.252 matter on bigger jobs: debris dropped more than 20 feet outside a building needs an enclosed chute, and solvent waste, oily rags and flammable liquids go in fire-resistant covered containers.
Then there is stormwater. The Texas Commission on Environmental Quality’s Construction General Permit covers construction that disturbs one acre or more, or smaller lots that are part of a larger common plan. A single-lot remodel usually will not trigger it, so check with your site operator or engineer. Where it does apply, the permit calls for “closing waste container lids at the end of the workday and during storm events,” and for a cover like a tarp on containers that do not have lids.
On the Gulf Coast, a tarp is good practice even where the permit does not apply. Wind and heavy rain are exactly when loose debris leaves a job site.
For the rules on a permanent business dumpster area, as opposed to a job site, see permanent dumpster area rules.
Where Does Construction Debris Go in Texas?
To landfills permitted to take it, including Type IV landfills that accept only construction-type waste. Anywhere else is illegal dumping.
TCEQ describes Type IV landfills as units “for disposal limited to brush, construction and demolition waste, and rubbish.” Its guide to wastes accepted by Texas landfills lists regulated asbestos-containing material and household waste as not allowed at Type IV units.
That is why asbestos matters before demo. EPA’s asbestos rules require “a thorough inspection where the demolition or renovation operation will occur” on commercial jobs. Houses with four or fewer units are generally excluded, unless they are part of a larger commercial or public project. If you suspect old siding, flooring or insulation contains asbestos, have a licensed inspector check it before it goes in any box. Our list of what cannot go in the box covers the other common no-go items.
TCEQ defines illegal dumping as disposing of waste “any place other than a landfill or other approved waste disposal site,” and it names construction debris among the most commonly dumped items. Hiring a hauler to take it to the right place is how a job stays on the right side of that line.
Common Questions About Construction Dumpsters in Southeast Texas
Straight answers for builders, remodelers and owner-builders around Baytown and Chambers County.
How much debris does building a house create?
EPA’s job-site surveys put new home construction at about 4.39 pounds of debris per square foot. By that average, a 2,000 square foot house produces roughly 4.4 tons over the build. It is a national planning figure, so your job may run higher or lower.
Can I put framing scrap and concrete in the same dumpster?
You can, but it usually wastes money. Concrete weighs about 860 pounds per cubic yard and clean lumber about 169, so a little concrete can hit the weight limit before the box is full. Keep heavy material in its own smaller box and ask us how to split the loads.
Does OSHA require a dumpster on a construction site?
OSHA does not name a roll-off, but it does require containers for the collection and separation of waste, and it requires scrap to be removed from the work area as the work progresses. On most jobs, a roll-off is the practical way to meet both.
Do I need to cover my dumpster on a construction site in Texas?
If the site falls under the TCEQ Construction General Permit, which covers one acre or more of disturbed land or part of a larger plan, yes. Close lids at the end of the workday and during storms, or use a tarp. On smaller jobs it is still good practice on the coast.
Where does construction debris go in Texas?
To permitted landfills, including Type IV landfills that take only brush, construction and demolition waste, and rubbish. Dumping it anywhere else counts as illegal dumping under TCEQ’s definition.
Can asbestos or old siding go in a construction dumpster?
Not regulated asbestos. Texas Type IV landfills do not accept regulated asbestos-containing material, and EPA requires an inspection before commercial demolition or renovation. If you suspect asbestos, have a licensed inspector check it first.